Skip to main content
MujingtongEcommerce & Trade AcademyGlobal business starts with lifelong learning
Amazon

Amazon Opens Its 12th Logistics Center in Poland, Covering More Than 20 Ten Thousand Square Meters

Published · Updated

Chuhai Wang reports that Amazon has completed and opened a new logistics center in Dobromierz, Lower Silesian Voivodeship, Poland, with a usable floor area exceeding 20 ten thousand square meters. The center has four floors and a volume of 130 ten thousand cubic meters. Its technical infrastructure has been adapted for robotic operating systems, and its roof is equipped with 3.28 megawatts of photovoltaic capacity. Kajima Poland served as the general contractor. Construction began in month 4 of 2025 and was completed in month 9 of this year. This is Amazon's 12th facility of this kind in Poland. Amazon entered the Polish market in 2014 and currently directly employs more than 1.9 ten thousand people locally. Its cumulative investment from 2012 to 2025 exceeded 450 hundred million zlotys, and it plans to invest another 230 hundred million zlotys from 2026 to 2028. Warehousing and fulfillment capacity for Amazon's Polish marketplace continues to expand. Sellers can monitor subsequent changes in inbound inventory requirements and delivery lead times.

Source: Xiaohai · Read the original article

Sign in to save your progress

Related Learning